Suitable for various marble working applications, making and repairing white temple, white marble work, sealing core cutting area of PVC pipe and concrete
Step 1 : Surfaces must be clean, dry and free from oil, wax and paint.
Step 2 : Roughen smooth surfaces for better adhesion by sandblasting or sanding with emery cloth.
Step 3 : Wash glass and ceramic surfaces with soap and water then rinse and let dry.
Step 4 : Pre-fit parts to be joined.
Step 5 : Squeeze equal volume of material from both part-A & part-B.
Step 6 : Mix resin and hardener for one minute thoroughly and then apply as per requirement.
Step 7 : Setting time will be 4-6 hours.
Step 8 : Fully cured in 24 hours.
Excellent bond strength
Easy to sand and drill after curing
No shrinkage
Dry cement colours can be added
Shelf Life: 2 years from date of mfd. (Storage Temp 2-40°C)
Storage: Product should be stored in a dry place in their original, properly closed containers at temperature between 2-40°C. Partially emptied container should be closed immediately.