TRUBUILD WALLTECT TOP COAT

Elastomeric & Decorative Acrylic Waterproofing Coating for Exterior Walls

 

TRUBUILD WALLTECT TOP COAT is high grade Acrylic base single component elastomeric durable waterproof exterior coating, which is made with selected and graded fine fillers, with biocides additive for exterior wall. It has excellent flexibility, breathability, water resistance, crack-bridging, weathering durability and an excellent resistance to the growth of microorganisms.

It complies standards / Method-ASTM D 412:2016, ASTM D 1653, ASTM D 471, EN 1062-7, EN 12390-8:2019, ASTM D4587:11, ASTM D4541:2017, ASTM E 1980-19, EN 12898:2019, EN 673:2011, EN 410:2011, DIN EN 1062-6:2002 & ASTM G21:2015.

Application
Applications
  • Facades
  • External walls
  • Masonry walls
  • Exterior RCC
  • Cement sand rendering
Application
Advantages

Advantages

 

  • Excellent waterproofing system.
  • Durable coating.
  • Excellent resilience to thermal stress.
  • Eco friendly.
  • Excellent weather resistance.
  • Maintain good aesthetic look.
  • Provides excellent barrier to carbonation and Chlorination

 

Features

 

  • Provides excellent waterproofing.
  • UV resistance.
  • Good breathability.
  • Can be applied on damp surface.
  • Not required any additional protection.
  • Can be tinted to obtained desired color.
  • Excellent adhesion to the substrate.
  • Fungal Resistance
  • Excellent Elongation and Good crack bridging capacity.
  • Good SRI value
  • Good Anti-carbonation & chloride resistance
How to use
How to use

Surface Preparation

 

  • For old structure remove the loose unsound materials, oil, dirt, debris, existing paint, waterproof coatings or any type of other surface contaminations from the substrates. Treat any areas affected by Algae, moss or fungal growth with biocide wash solution. This is accomplished by pressure cleaning equipment with a minimum capability of 100-140 bar water pressure. For new construction remove all loose unsound materials, grease, oils etc must be removed completely by help of sand papers or pressurised water blasting.
  • Fill all the existing cracks up to 5 mm by making “V” groove and then filling it with Trubuild crack filler paste (CFP 425). For cracks larger than 5mm use Polymer modified mortar making with Trubuild WPL 333/Trubuild BWP 222

 

Application

 

  • Before application of Trubuild Walltect Top coat, a primer coat with Trubuild primesure Primer on the substrate should be done. During application of primer, it is to be ensured that the surface should be in Saturated Dry Condition(SSD). For Filling the pores on the surface and providing good bonding to subsequent upcoming waterproofing layer use Trubuild Primesure primer in 2:1 (50% dilution with water) chemical to water ratio by weight, mix it well till we get homogeneous mixture using Low RPM paddle mixture. Before applying primer use air blower (Don’t use Hot air blower) to remove the dust present on surface, if any. The coverage of primer coat will be approx. 8-10sqmtr per ltr per coat, depending upon the substrate condition and apply all over the wall. After drying of Primer coat around 6-8 hours apply apply 1st coat of Trubuild walltect Top coat horizontally without any dilution. Allow the first coat to dry for min. 6-8 hours. then apply 2nd coat vertically without dilution The application coverage should be maintained 3.0-3.5 sq.mtr per ltr per two coats. Then allow coating to air cure for min. 7- 10 days for fully curing.
  • Repainting- For repainting work, the performance of Trubuild Walltech Top coat will depend upon the condition of the existing paint. If the existing paint film is flaking or has a weak bonding with the substrate then the subsequent coat of Trubuild Walltech Topcoat will face the adhesion problem. In case of repainting, application of Trubuild Primesure Primer is not necessary if the current surface is in sound condition and is stable, i.e., no flaking, peeling and loose particles on the surface. For a repainting work ,apply 1st coat of Trubuild walltect Top coat horizontally without any dilution. Allow the first coat to dry for min. 6-8 hours. then apply 2nd coat vertically without dilution the application coverage should be maintained 3.0- 3.5 sq.mtr per ltr per two coats. Then allow coating to air cure for min. 7- 10 days for fully curing.

 

TECHNICAL DETAILS

 

PROPERTIES STANDARD RESULTS
Appearance IN HOUSE Opaque, white
Solid (%) ASTM D 1644:01 55±2
Elongation@120 µ (%) ASTM D 412-2016 ≥ 160
Crack bridging ability (mm) EN 1062-7 >1
DFT (mm)   120 µ
Tensile strength (N/mm²) ASTM D 412-2016 ≥2
Density (gm/cc)   1.29±0.01
Pull of Adhesion, (Mpa) ASTM D 4541:2017 ≥2
Water Absorption (%), 24 hrs. ASTM D 471 < 10
Carbon dioxide diffusion, air layer thickness (m) DIN EN 10626:202 >80
RCPT (Coulombs) ASTM C1202:2019 < 2000
Water Penetration at 5 bar Pressure EN 12390-8:2019 Nil
Water Vapour transmission, (Gm/sq.mtr/day) ASTM D 1653 > 100
Fungi Resistance ASTM G21:2015 Excellent
UV Resistance ASTM D 4584:2011 Excellent
SRI ASTM E 1980-19 EN 12898:2019 EN 673:2011 EN 410:2011 98

 

Coverage
  • Trubuild Primesure Primer is 8-10 sqmtr/ltr/coat
  • Trubuild walltect Top coat is 3-3.5 sq.mtr /ltr/2 coats of to achieve the 120µ±10 DFT.

NOTE 1 - Coverage will depend upon the porosity & Undulation of the substrate.

Shelf Life
Shelf Life

36 months (Storage Temp 2°C - 40°C)

Storage
Storage

Product should be stored in a dry place in their original, properly closed containers at temperature between 2°C - 40°C. Partially emptied container should be closed immediately.

Packing
  • Packing

    Bag:
    1 Ltr, 4 Ltr & 20 Ltr

Application
Handling precautions

Precaution and Limitation

 

  • Prior to use Trubuild walltect Top coat, ensure previous waterproofing treatment is completely removed and cleaned.
  • Ensure proper consumption of material to achieve all the properties.
  • Mix well after opening container using low rpm paddle mixture to get homogeneous mix.
  • Avoid application in intermittent of rain or on standing/runoff water at surface.
  • Application of Trubuild walltect Top coat should be avoided in any water retaining structure.
  • Avoid application of Trubuild walltect Top coat, if the substrate temperature is less than 10 °C and greater than 35 °C & RH should not exceed 75%.
  • Consumption of all the material should done in a single go, once it is opened to avoid any contamination in it.
  • Do not mix any emulsion or water to it, it will decrease the durability and performance of the coating.
  • Always use brush and rollers for coating application.
  • Do not keep material under direct sunlight. Always keep it in shade and close the Lid for keeping it air tight to avoid skinning.
  • Take out the sufficient quantity of material from the container which you can consume within 15-30min.
  • Always use air blower (Don’t use Hot air blower) before commencement of coating to remove the dust.
  • Do not use other manufacturer primer or other material which is used for repairing and priming as it will not confront any type of performance which we are providing with our product and system.
  • Do not skip any one of the systems as prescribed for the application of Trubuild Walltect Top coat. It may decrease the performance and even lead to failure of entire system.
  • For miscellaneous surface always contact Trubuild Technical service team for guidance.
  • Always use clean brush and roller to avoid foreign material intrusion in coating and which may get peeled off taking waterproofing coating with it.
  • Application of the Trubuild Walltect Top coat should be as per the Coverage above mentioned for better bonding with substrate.
  • Please read all the guidelines and always try to get in touch with our Trubuild Technical sales person before starting any type of application for avoiding any waterproofing system failure.
  • Adhesion property may get affected over putty and very smooth surfaces.
  • If the surface has excess moisture then there is possibility of blister formation in case of all liquid applied membrane coatings.
  • Check the existing paint – cement paint if any, to be removed as best as possible.
  • Coating is not recommended on putty as well as on synthetic enamels, bituminous paints.
  • Substrate should be fully cured as per standard construction practice before application of coatings.

Mandatory and recommended industrial hygiene procedures should be followed whenever our products are being handled and processed. For additional information please refer Material safety data sheet.

X
Enquire Now